Missouri Technology Corporation logo
Physical Infrastructure Grant Program

Physical Infrastructure Grant

Funds Missouri nonprofit ecosystems with resources to build coworking, laboratories, and entrepreneurship space.

Opens 2027Missouri Technology CorporationUnited StatesDeep-tech · adjacent

⚠ This may reflect a past cycle — verify the current call on the funder's site.

The Missouri Technology Corporation (MTC) Physical Infrastructure Grant supports Missouri nonprofit organizations and research institutions in providing below-market-rate physical workspace for entrepreneurs. Established as a pilot in 2023 and running as a full competitive program since 2024, the grant funds co-working areas, private offices, meeting rooms, high-speed internet, and specialized sector facilities such as wet labs for biotech and greenhouses for agtech. MTC is a public-private partnership created by the Missouri General Assembly under RSMo Ch. 348 to promote technology-based entrepreneurship statewide.

Eligible applicants are Missouri-based public or private nonprofit research institutions, including higher education institutions, and nonprofit entrepreneurial support organizations. For-profit entities cannot apply. The 2026 grant period begins September 1, 2026 and applicants may propose 1-year (through August 2027), 2-year (through August 2028), or 3-year (through August 2029) operational plans. Award amounts per organization are not published, but MTC has selected seven awardees in each of the 2024 and 2025 cycles. Past awardees include BioSTL, KC Digital Drive, Joplin Area Chamber of Commerce, 39 North AgTech Innovation District, and Missouri Innovation Center.

The 2026 application window opened April 15 and closed May 22, 2026; award notifications are expected in late July or early August 2026. Applications are submitted through the Good Grants portal at missouritechnology.grantplatform.com. Organizations building or maintaining entrepreneurial hubs in underserved Missouri regions — particularly those offering sector-specific lab capacity — are the strongest fit for this program.

Physical infrastructure for Missouri entrepreneurial ecosystems, including co-working space, private offices, meeting rooms, high-speed internet, and specialized sector labs such as wet labs and greenhouses.

CycleiHow often this grant runs — e.g. annually, on a rolling basis, or a one-off call.Annual
Next deadlineiThe next date applications are due. Rolling means you can apply any time.—
Decision timeiTypical time from the deadline to the funder's decision.—
Project durationiHow long the funded work is expected to run.12–36 months
Award typeiThe form of funding — grant, equity, loan, tax credit, etc.Grant
Match fundingiThe share of project costs you must cover yourself. 0% = fully funded.0%
Funding pooliThe total budget available across all awards in this round.—

Sign up free to see the funding breakdown

Sign up free to see the industries in scope

Sign up free to see the full eligibility

Sign up free to see how to apply

Sign up free to see the timeline

Last verified: 29 Jun 2026Source: www.missouritechnology.com