Texas Department of Transportation logo
Texas NEVI EV Charging Infrastructure Grant

Texas NEVI EV Charging Infrastructure Grant

Funds private companies installing and operating DC fast charging stations across Texas under the federal NEVI Formula Program.

Between cyclesTexas Department of TransportationUnited States

The Texas Department of Transportation (TxDOT) administers the National Electric Vehicle Infrastructure (NEVI) Formula Program in Texas, a federally funded grant program established by the Infrastructure Investment and Jobs Act (November 2021). TxDOT awards competitive grants directly to private companies to purchase, install, operate, maintain, and report usage of Direct Current Fast Charging (DC…

Electric vehicle DC fast charging (DCFC) infrastructure — installation, operation, maintenance, and usage reporting of DCFC equipment in Texas county seats and metropolitan areas.

CycleiHow often this grant runs — e.g. annually, on a rolling basis, or a one-off call.Annual
Next deadlineiThe next date applications are due. Rolling means you can apply any time.—
Decision timeiTypical time from the deadline to the funder's decision.30 weeks
Project durationiHow long the funded work is expected to run.—
Award typeiThe form of funding — grant, equity, loan, tax credit, etc.Grant
Match fundingiThe share of project costs you must cover yourself. 0% = fully funded.20%
Funding pooliThe total budget available across all awards in this round.$323M

Sign up free to see the funding breakdown

Sign up free to see the industries in scope

Sign up free to see the full eligibility

Sign up free to see how to apply

Sign up free to see what you submit

Sign up free to see how they score you

Sign up free to see the timeline

Sign up free to see where teams trip up

Last verified: 24 Jul 2026Source: ftp.txdot.gov